A phone maker removes its end-of-line inspectors. Instead, each worker is trained to check their own work against written standards before passing it on. Which method is this, and what is the likely effect on costs?
- Checking is now done at every stage by the workers themselves, not by inspectors at the end.
- The aim is to prevent faults, not to find them afterwards, so this is quality assurance, not quality control.
- Training and writing the standards cost money at first.
- Faults are caught early, so less material and labour is wasted on scrapped or reworked phones.
Answer: Quality assurance: costs rise in the short run (training) but waste, rework and returns should fall in the long run.